Back to All Projects

Jewel House | Tower of London, UK

The permanent exhibition at the Tower of London, illuminated through a carefully considered lighting scheme that honours the collection’s extraordinary history and significance. Michael Grubb Studio brought greater focus to the displays while creating a flexible approach for the future presentation of these historic treasures.

  • Crown Jewels exhibition lighting design at the Tower of London, illuminating the permanent royal collection.
  • Room 4 of the new Jewel House exhibition, with carefully balanced lighting design across the exhibition displays.
  • Interior lighting in Room 2 of the Crown Jewels exhibition at the Tower of London, London.

Bringing the History of the Crown Jewels to Life at the Tower of London

Opened on 26 May 2023 to coincide with the Coronation year, the exhibition offers a fresh perspective on the origins of some of the world’s most treasured objects. For the first time, it showcases how these historic jewels have traversed different eras and owners. Spearheaded by Historic Royal Palaces, this re-presentation took over four years of meticulous planning.

This project marks the first significant change to the display in over a decade. Ralph Appelbaum Associates, the lead designer, appointed Michael Grubb Studio to create an impactful interior lighting design, underscoring the exhibition’s power and historical relevance. The exhibition is divided into two distinct sections: the Western half features the new exhibition space, while the Eastern half houses the Treasury, displaying the Crown Jewels.

  • Lighting design for a royal heritage exhibition in London, creating visual focus across the Jewel House galleries.
  • Interior lighting highlighting the architecture and exhibition displays within the Tower of London's Jewel House.

Carefully Illuminating the Permanent Royal Display

The lighting incorporates in-case lighting for new showcases, as well as focused on upgrading existing architectural lighting. This upgrade includes the specification of an advanced lighting control system for the Jewel House. To meet the project brief, the lighting scheme emphasises flexibility, sustainability, and an exceptional visitor experience. The new showcases house various artefacts, supported by engaging media materials. Therefore, it was vital to arrange the lighting to grant the client the flexibility to illuminate each item effectively.

Adjustable fittings with variable beams inside the showcases ensure tailored lighting for this permanent exhibition. Each showcase features three control channels, offering maximum versatility. The layout of the lighting fittings coordinates with the placement of artefact labels without being overly tailored to the contents, ensuring future-proofing of the new showcases.

  • Carefully illuminated showcases within the Jewel House, designed to accommodate the changing presentation of historic artefacts.
  • Focused lighting across the display cases and interpretive elements in Room 2 of the Crown Jewels exhibition.

“It has been a huge pleasure to work with Historic Royal Palaces on this project. It’s wonderful to work with people who are so dedicated to their individual speciality and role. On a personal level, it was fantastic to be working with so many talented women who were leading the client and design teams and who made the project a joy to be a part of.

We have worked with Ralph Appelbaum on several projects and really enjoy collaborating with them. This project was no exception; it was an honour to work on such a culturally significant project and bring the rich display to light.”

Rachael Flint, Associate of Michael Grubb Studio

 

This project is featured in the articles below

blooloop  |  The Conversation  |  The Guardian  |  The Jewellery Editor

 

Client

Historic Royal Palaces

Lead Designer

Ralph Appelbaum Associates

Contractor

Factory Settings

Graphic Display

Squint/Opera

Location

London, United Kingdom

Awards

Museums + Heritage Awards 2024 (Shortlisted)